Client Name
BC Ministry of Transportation and Infrastructure
Location
Dawson Creek, BC
Sector
Highway Bridge
Started
2020
Completed
2022
Cost
$9,000,000.00
Project Description
Formula was awarded the construction of the 8th Street bridge located on Highway 2 in the city of Dawson Creek, BC.
The project included:
- construction of a sanitary lift station and utility tie-ins
- construction of a 5-lane bridge
- removal of the existing culverts and asbestos-cement municipal utilities in the embankment
- installation of slope stabilization piles
- shear key below the creek channel channel armoring and revegetation
Due to the critical location (downtown) of this bridge a 2-phase approach was utilized. Formula completed the bridge in 2-halves to allow for traffic flow to continue throughout the project span.