Back To Projects

Gordon Creek Bridges

Client Name
Peace River Coal
Location
Tumbler Ridge, BC
Sector
Mining
Started
2011
Completed
2011
Cost
$1,200,000.00

Project Summary

Formula was engaged in the construction of three (3) L100 Bridges including foundation, footings, columns, bracing, backwall, caps and bearings.  A full structural deck, bridge rails, all approaches and retaining wall were completed.  This bridge was constructed to accommodate the owner’s equipment loads.

Project Gallery