Client Name
Peace River Hydro Partners
Location
Fort St. John, BC
Sector
TBD
Started
2018
Completed
2019
Cost
$3,700,000.00

Project Description

The supply and installation of 25 - 914mm dia. X 19.05mm wt., steel pipe pile casings by means of driving and drilling c/w steel reinforcement cages and infilling with concrete. Casings vary in lengths from 19.64m to 26.88m. All casings are to be embedded a minimum of 10m into underlying bedrock.

Throughout the project crews were challenged by the winter conditions in northern BC and a tight schedule.